Wadi Arab Water System
Irbid - Jordan
Water system with 26,2 km long steel pipeline able to process up to 4,200m³ of water per hour with a total of 83,000m³ of water per day. Built for the Water Authority of Jordan.
Project Status:20/07/2020
Client:Water Authority of Jordan