Beni Haroun (PK9 Tunnel, Pumping Line) Potable Water Pipeline
Hamala - Algeria
Construction of a potable water pipeline with a pipeline transmission length of 4,2 kilometres and a pipeline diameter of 100 inches, built for the National Agency of Dams and Transfers, Algeria (ANBT).
Project Status:31/08/2020
Client:National Agency of Dams and Transfers (ANBT), Algeria