Aramco Master Gas System (MGS) Phase 3 Pkg 4
Ahsa - Saudi Arabia
This project mainly consists of two parallel pipelines, two scrapper facilities at the beginning and end of the pipelines, 6 mainline valve (MLIV) stations, 6 burn pits, and directly buried FOC cables. The pipeline route is 150.28 km, and a double 56" pipeline with separate trenches will be constructed, totaling 300.57 km. Each MLIV station involves 2 valves, and 12 ea. modularized 56" valves will be installed. 2 scrapper traps will be installed on scrapper facilities, totaling 4 scrapper traps. 160 km of FOC cable will be installed inside one trench as directly buried.
Project Status:Ongoing
Client:Aramco