Construction of Trabzon Southern Ring Road (Part 1)
Trabzon – Türkiye
The project, commissioned by the General Directorate of Highways – Department of Monitoring, comprises the construction of a 16.5 km dual three-lane asphalt concrete highway. The scope includes 7 tunnels with a total length of 14.358 km, 7 viaducts spanning a combined length of 878 m, and 3 grade-separated interchanges, contributing to a safe, efficient, and well-connected transportation network.
Project Status:Ongoing
Client:General Directorate of Highways Department of Monitoring