Aircraft Maintenance Hangar, Baku
Baku - Azerbaijan
Construction of a 22,000m² hangar, which includes a door span opening of 160 m, for Silk Way Airlines, capable of accommodating 6 narrow-body aircraft.
Project Status:12/10/2011
Client:Silk Way Airlines