Setif - Hodna Potable Water Pipeline
Setif - Hodna - Algeria
A potable water pipeline with 5 pumping stations, a transmission pipeline length of 40 km and a pipeline diameter of 72 -100 inches, built for the National Agency of Dams and Transfers, Algeria (ANBT).
Project Status:14/04/2018
Client:National Agency of Dams and Transfers (ANBT), Algeria